Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with West Delta in Visund, 07.10.1997 to 10.11.1997 (34 days), to 3 642,0 m.

Water depth335,0 m
Total depth3 642,0 m MD
Vertical depth3 046,2 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigWest Delta
Spud07.10.1997
Completed10.11.1997
OperatorNorsk Hydro Produksjon AS
Position61,3704 N, 2,4591 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Visund gradient39,6 °C/km
Estimated at total depth from the gradient110 °C

The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
34/8-A-7 AH same well0,0----
34/8-A-6 AH0,09 082,0--2005
34/8-A-6 H0,08 170,0--2004
34/8-A-8 AH0,06 582,0--2009
34/8-A-8 BH0,08 040,0--2010
34/8-A-8 H0,05 375,0--2001
34/8-A-31 H0,04 595,0--2016
34/8-A-9 AH0,04 626,0--2008

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗