34/8-A-9 AH
Development, productionClosedOil
Drilled by StatoilHydro ASA with Visund in Visund, 20.02.2008 to 27.04.2008 (67 days), to 4 626,0 m.
Water depth335,0 m
Total depth4 626,0 m MD
Vertical depth3 102,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigVisund
Spud20.02.2008
Completed27.04.2008
OperatorStatoilHydro ASA
Position61,3704 N, 2,4589 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 112 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-A-9 H same well | 0,0 | 4 384,0 | - | - | 1999 |
| 34/8-A-8 AH | 0,0 | 6 582,0 | - | - | 2009 |
| 34/8-A-8 BH | 0,0 | 8 040,0 | - | - | 2010 |
| 34/8-A-8 H | 0,0 | 5 375,0 | - | - | 2001 |
| 34/8-A-10 AH | 0,0 | 3 997,0 | - | - | 2000 |
| 34/8-A-10 H | 0,0 | 4 015,0 | - | - | 2000 |
| 34/8-A-7 AH | 0,0 | - | - | - | - |
| 34/8-A-7 H | 0,0 | 3 642,0 | - | - | 1997 |
Casing and formation tests
No casing programme is reported for this wellbore.