34/8-A-31 H
Development, productionClosedOil
Drilled by Statoil Petroleum AS with Visund in Visund, 24.07.2016 to 07.09.2016 (45 days), to 4 595,0 m.
Water depth335,0 m
Total depth4 595,0 m MD
Vertical depth2 930,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigVisund
Spud24.07.2016
Completed07.09.2016
OperatorStatoil Petroleum AS
Position61,3705 N, 2,4592 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 105 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-A-34 H | 0,0 | 7 458,0 | - | - | 2017 |
| 34/8-A-7 AH | 0,0 | - | - | - | - |
| 34/8-A-7 H | 0,0 | 3 642,0 | - | - | 1997 |
| 34/8-A-6 AH | 0,0 | 9 082,0 | - | - | 2005 |
| 34/8-A-6 H | 0,0 | 8 170,0 | - | - | 2004 |
| 34/8-A-8 AH | 0,0 | 6 582,0 | - | - | 2009 |
| 34/8-A-8 BH | 0,0 | 8 040,0 | - | - | 2010 |
| 34/8-A-8 H | 0,0 | 5 375,0 | - | - | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.