34/8-B-1 H
Development, observationPlugged
Drilled by Norsk Hydro Produksjon AS with Transocean Arctic in Visund, 29.12.1999 to 30.01.2000 (32 days), to 3 280,0 m.
Water depth381,0 m
Total depth3 280,0 m MD
Vertical depth3 082,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table24,0 m
Formation at total depth-
RigTransocean Arctic
Spud29.12.1999
Completed30.01.2000
OperatorNorsk Hydro Produksjon AS
Position61,4308 N, 2,5678 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 110 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-B-1 AH same well | 0,0 | 5 405,0 | - | - | 2002 |
| 34/8-B-2 H | 0,0 | 4 880,0 | - | - | 2001 |
| 34/8-C-2 AH | 1,2 | 5 081,0 | - | - | 2014 |
| 34/8-C-2 H | 1,2 | 4 437,0 | - | - | 2014 |
| 34/8-C-3 AH | 1,2 | 5 078,0 | - | - | 2013 |
| 34/8-C-3 BH | 1,2 | 4 700,0 | - | - | 2023 |
| 34/8-C-3 H | 1,2 | 3 456,0 | - | - | 2013 |
| 34/8-17 S | 1,2 | 4 587,0 | - | 1,78 | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.