34/8-B-2 H
Development, productionPluggedOil
Drilled by Norsk Hydro Produksjon AS with West Delta in Visund, 08.01.2001 to 04.05.2001 (116 days), to 4 880,0 m.
Water depth382,0 m
Total depth4 880,0 m MD
Vertical depth2 962,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table29,0 m
Formation at total depth-
RigWest Delta
Spud08.01.2001
Completed04.05.2001
OperatorNorsk Hydro Produksjon AS
Position61,4311 N, 2,5683 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Visund gradient | 39,6 °C/km |
| Estimated at total depth from the gradient | 105 °C |
The gradient is the median of 12 released wells in Visund with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-B-1 AH | 0,0 | 5 405,0 | - | - | 2002 |
| 34/8-B-1 H | 0,0 | 3 280,0 | - | - | 1999 |
| 34/8-C-2 AH | 1,2 | 5 081,0 | - | - | 2014 |
| 34/8-C-2 H | 1,2 | 4 437,0 | - | - | 2014 |
| 34/8-C-3 AH | 1,2 | 5 078,0 | - | - | 2013 |
| 34/8-C-3 BH | 1,2 | 4 700,0 | - | - | 2023 |
| 34/8-C-3 H | 1,2 | 3 456,0 | - | - | 2013 |
| 34/8-17 S | 1,2 | 4 587,0 | - | 1,78 | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.