Fields / 34/8-U-2
34/8-U-2
Other, soil drillingPlugged and abandoned
Drilled by StatoilHydro Petroleum AS with Bucentaur, 02.10.2009 to 03.10.2009 (1 days).
Water depth291,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table-
Formation at total depth-
RigBucentaur
Spud02.10.2009
Completed03.10.2009
OperatorStatoilHydro Petroleum AS
Position61,3006 N, 2,3640 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 34/8-V-4 AH | 0,0 | 4 160,0 | - | - | 2011 |
| 34/8-V-4 BY1H | 0,0 | 4 721,0 | - | - | 2012 |
| 34/8-V-4 BY2H | 0,0 | 4 815,0 | - | - | 2012 |
| 34/8-V-4 CH | 0,0 | 3 644,0 | - | - | 2019 |
| 34/8-V-4 DH | 0,0 | 6 905,2 | - | - | 2025 |
| 34/8-V-4 EH | 0,0 | 6 937,0 | - | - | 2026 |
| 34/8-V-4 H | 0,0 | 3 181,0 | - | - | 2011 |
| 34/8-V-1 AH | 0,0 | 5 160,0 | - | - | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.