Fields / 35/10-12 S
35/10-12 S
Exploration, appraisalPlugged and abandonedOil and gas
Drilled by Wellesley Petroleum AS with COSLPromoter, 04.06.2024 to 07.07.2024 (33 days), to 3 830,0 m.
Water depth363,0 m
Total depth3 830,0 m MD
Vertical depth3 371,0 m TVD
Bottom-hole temperature128 °C
Max inclination47,7°
Rotary table25,0 m
Formation at total depth-
RigCOSLPromoter
Spud04.06.2024
Completed07.07.2024
OperatorWellesley Petroleum AS
Position61,1488 N, 3,2722 E
Formations
24 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 128 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/10-4 A | 0,7 | 3 946,0 | 128 °C | 1,56 | 2018 |
| 35/10-4 S | 0,7 | 4 010,0 | 150 °C | 1,82 | 2018 |
| 35/10-4 B | 0,7 | - | - | - | - |
| 35/10-13 S | 1,7 | 1 862,0 | 73 °C | 1,22 | 2024 |
| 35/10-11 A | 1,8 | 1 690,0 | - | 1,20 | 2024 |
| 35/10-11 S | 1,8 | 1 853,0 | 68 °C | 1,60 | 2024 |
| 35/10-9 | 3,5 | 1 824,0 | 65 °C | 1,21 | 2023 |
| 35/11-18 | 4,0 | 3 759,0 | 145 °C | 1,64 | 2015 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 454,0 | 36" | 455,8 | - |
| Intermediate | 13 3/8" | 1 202,5 | 17 1/2" | 1 208,0 | 1,58 FIT |
| Intermediate | 9 5/8" | 3 480,0 | 12 1/4" | 3 480,0 | 1,80 FIT |
| Open hole | - | 3 830,0 | 8 1/2" | 3 830,0 | - |
Mud weight
7 measurements, one dot each, 1,20 to 1,40 g/cm³ against measured depth, glydril wbm, rheguard prime.