Fields / 35/10-U-1
35/10-U-1
Other, shallow gasPlugged and abandoned
Drilled by Aker BP ASA with Scarabeo 8, 04.07.2026 to 05.07.2026 (1 days), to 1 000,0 m.
Water depth356,8 m
Total depth1 000,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table33,6 m
Formation at total depth-
RigScarabeo 8
Spud04.07.2026
Completed05.07.2026
OperatorAker BP ASA
Position61,0744 N, 3,3000 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/10-15 A | 0,8 | 3 309,0 | - | - | 2025 |
| 35/10-15 S | 0,8 | 2 105,0 | - | - | 2025 |
| 35/11-3 S | 2,5 | 4 040,0 | 144 °C | 1,62 | 1989 |
| 35/11-22 S | 2,8 | 3 882,0 | - | 1,52 | 2018 |
| 35/10-8 S | 4,6 | 2 119,0 | 75 °C | 1,36 | 2022 |
| 35/11-29 S | 5,1 | 3 600,3 | 138 °C | 1,54 | 2024 |
| 35/11-5 | 5,3 | 3 769,0 | 134 °C | 1,51 | 1991 |
| 35/11-28 S | 5,8 | 3 333,0 | 119 °C | 1,41 | 2024 |
Casing and formation tests
No casing programme is reported for this wellbore.