Fields / 35/2-1
35/2-1
Exploration, wildcatSuspendedGas
Drilled by Norsk Hydro Produksjon AS with Deepsea Trym, 23.07.2005 to 28.08.2005 (36 days), to 713,0 m in the Nordland Group.
Water depth384,0 m
Total depth713,0 m MD
Vertical depth713,0 m TVD
Bottom-hole temperature24 °C
Max inclination1,2°
Rotary table25,0 m
Formation at total depthNordland Group
RigDeepsea Trym
Spud23.07.2005
Completed28.08.2005
OperatorNorsk Hydro Produksjon AS
Position61,8907 N, 3,3429 E
Formations
1 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 24 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 482,0 | 36" | 483,0 | - |
| Surface casing | 13 3/8" | 539,0 | 17 1/2" | 543,0 | 1,30 LOT |
| Intermediate | 9 5/8" | 560,0 | 12 1/4" | 561,0 | 1,29 LOT |
| Open hole | - | 713,0 | 8 1/2" | 713,0 | - |