Fields / 35/2-U-4
35/2-U-4
Other, shallow gasJunked
Drilled by Statoil Petroleum AS with Deepsea Trym, 21.07.2005 to 22.07.2005 (1 days), to 544,0 m.
Water depth384,0 m
Total depth544,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigDeepsea Trym
Spud21.07.2005
Completed22.07.2005
OperatorStatoil Petroleum AS
Position61,8909 N, 3,3429 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.