35/9-15 A
Development, observationPlugged
Drilled by Neptune Energy Norge AS with Deepsea Yantai in Gjøa, 13.02.2020 to 28.02.2020 (15 days), to 3 250,0 m.
Water depth363,3 m
Total depth3 250,0 m MD
Vertical depth2 445,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table27,3 m
Formation at total depth-
RigDeepsea Yantai
Spud13.02.2020
Completed28.02.2020
OperatorNeptune Energy Norge AS
Position61,3988 N, 3,9733 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gjøa gradient | 36,4 °C/km |
| Estimated at total depth from the gradient | 79 °C |
The gradient is the median of 7 released wells in Gjøa with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/9-15 B same well | 0,0 | 3 335,0 | - | - | 2020 |
| 35/9-15 S same well | 0,0 | 2 520,0 | - | - | 2020 |
| 35/9-U-2 | 1,2 | 924,0 | - | - | 2009 |
| 35/9-F-1 AH | 1,2 | 2 350,0 | - | - | 2009 |
| 35/9-F-1 H | 1,2 | 3 034,0 | - | - | 2009 |
| 35/9-G-2 H | 1,5 | 456,0 | - | - | 2020 |
| 35/9-G-1 H | 1,6 | 3 423,0 | - | - | 2020 |
| 35/9-G-4 H | 1,6 | 4 393,0 | - | - | 2020 |
Casing and formation tests
No casing programme is reported for this wellbore.