35/9-G-1 H
Development, productionProducingGas
Drilled by Neptune Energy Norge AS with Deepsea Yantai in Gjøa, 24.08.2020 to 13.01.2021 (142 days), to 3 423,0 m.
Water depth364,0 m
Total depth3 423,0 m MD
Vertical depth2 205,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table27,3 m
Formation at total depth-
RigDeepsea Yantai
Spud24.08.2020
Completed13.01.2021
OperatorNeptune Energy Norge AS
Position61,4051 N, 3,9995 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gjøa gradient | 36,4 °C/km |
| Estimated at total depth from the gradient | 70 °C |
The gradient is the median of 7 released wells in Gjøa with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/9-G-4 H | 0,0 | 4 393,0 | - | - | 2020 |
| 35/9-G-2 H | 0,0 | 456,0 | - | - | 2020 |
| 35/9-15 A | 1,6 | 3 250,0 | - | - | 2020 |
| 35/9-15 B | 1,6 | 3 335,0 | - | - | 2020 |
| 35/9-15 S | 1,6 | 2 520,0 | - | - | 2020 |
| 35/9-U-2 | 2,1 | 924,0 | - | - | 2009 |
| 35/9-F-1 AH | 2,1 | 2 350,0 | - | - | 2009 |
| 35/9-F-1 H | 2,1 | 3 034,0 | - | - | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.