Fields / Nova / 35/9-8
35/9-8
Exploration, appraisal Plugged and abandoned Oil
Drilled by Wintershall Norge AS with Transocean Arctic in Nova, 01.02.2013 to 11.04.2013 (69 days), to 3 256,0 m in the Rannoch Formation.
Water depth 368,0 m
Total depth 3 256,0 m MD
Vertical depth 3 255,0 m TVD
Bottom-hole temperature 113 °C
Max inclination 3,9°
Rotary table 24,0 m
Formation at total depth Rannoch Formation
Rig Transocean Arctic
Spud 01.02.2013
Completed 11.04.2013
Operator Wintershall Norge AS
Position 61,2853 N, 3,6756 E
Formations 32 tops reported, measured depth in metres.
Groups Nordland Group, top 392,0 m Nordland Gp Hordaland Group, top 695,0 m Hordaland Gp Rogaland Group, top 1 221,0 m Rogaland Gp Shetland Group, top 1 737,5 m Shetland Gp Cromer Knoll Group, top 2 704,5 m Viking Group, top 2 714,0 m Viking Gp Brent Group, top 3 146,0 m Brent Gp Formations Utsira Formation, top 650,0 m Utsira Fm Grid Formation, top 1 073,5 m Frigg Formation, top 1 108,0 m Undifferentiated, top 1 190,0 m Balder Formation, top 1 221,0 m Sele Formation, top 1 267,0 m Lista Formation, top 1 280,0 m No Formal Name, top 1 342,5 m No Formal Name Lista Formation, top 1 556,5 m Lista Fm Våle Formation, top 1 666,0 m Egga Fm (informal), top 1 727,0 m Jorsalfare Formation, top 1 737,5 m Jorsalfare Fm Kyrre Formation, top 1 862,0 m Kyrre Fm Tryggvason Formation, top 2 549,0 m Blodøks Formation, top 2 627,0 m Svarte Formation, top 2 633,0 m Rødby Formation, top 2 704,5 m Draupne Formation, top 2 714,0 m Heather Formation, top 2 730,0 m Intra Heather Fm Ss, top 2 740,0 m Intra Heather Fm Ss Heather Formation, top 2 875,0 m Heather Fm Tarbert Formation, top 3 146,0 m Ness Formation, top 3 155,0 m Etive Formation, top 3 205,0 m Rannoch Formation, top 3 215,0 m 392 500 1 000 1 500 2 000 2 500 3 000 3 256 Temperature Reported at total depth 113 °C
2 released wells in Nova report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells The nearest wellbores within 15 km, straight-line distance at the surface.
Wellbore km Total depth, m BHT Mud max, g/cm³ Year 35/8-U-6 0,5 389,4 - - 2017 35/9-W-2 H 0,5 3 273,0 - - 2021 35/9-W-3 H 0,5 4 795,0 - - 2024 35/8-U-5 0,5 388,9 - - 2017 35/9-W-1 AH 0,5 4 031,0 - - 2023 35/9-W-1 H 0,5 3 454,0 - - 2021 35/9-W-4 H 0,5 3 065,0 - - 2021 35/8-U-4 0,5 389,3 - - 2017
Casing and formation tests The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
String Casing Shoe, m Hole Hole depth, m Test, g/cm³ Conductor 30" 458,0 36" 461,0 - Surface casing 20" 890,0 26" 895,0 1,61 LOT Intermediate 13 3/8" 1 310,4 17 1/2" 1 317,0 1,64 LOT Intermediate 9 5/8" 2 536,0 12 1/4" 2 543,0 1,59 Liner 7" 3 255,0 8 1/2" 3 256,0 -
Mud weight 12 measurements, one dot each, 1,00 to 1,33 g/cm³ against measured depth, cacl2 brine, hi vis sweeps, kcl/polymer/glykol wbm, performadril wbm, performadril.
1,0 1,1 1,2 1,3 1,4 0 1 000 2 000 3 000 445,0 m: 1,05 g/cm³, HI VIS Sweeps 472,0 m: 1,29 g/cm³, KCL/POLYMER/Glykol WBM 895,0 m: 1,17 g/cm³, PERFORMADRIL WBM 1 006,0 m: 1,19 g/cm³, PERFORMADRIL WBM 1 317,0 m: 1,29 g/cm³, PERFORMADRIL WBM 2 460,0 m: 1,31 g/cm³, PERFORMADRIL WBM 2 632,0 m: 1,31 g/cm³, PERFORMADRIL WBM 2 803,0 m: 1,31 g/cm³, PERFORMADRIL WBM 3 256,0 m: 1,31 g/cm³, CaCl2 Brine 3 256,0 m: 1,31 g/cm³, PERFORMADRIL WBM 3 256,0 m: 1,33 g/cm³, Performadril 3 256,0 m: 1,31 g/cm³, CaCl2 Brine
Drill-stem tests Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
Test Interval, m Choke Pressure Temp. Oil Gas 1 2 776,0 - 2 789,0 9,5 - - 300 53 400