35/9-W-1 AH
Development, injectionInjectingWater
Drilled by Wintershall Dea Norge AS with Transocean Norge in Nova, 27.05.2023 to 03.07.2023 (37 days), to 4 031,0 m.
Water depth368,0 m
Total depth4 031,0 m MD
Vertical depth2 670,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,9 m
Formation at total depth-
RigTransocean Norge
Spud27.05.2023
Completed03.07.2023
OperatorWintershall Dea Norge AS
Position61,2853 N, 3,6659 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Nova report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 35/9-W-1 H same well | 0,0 | 3 454,0 | - | - | 2021 |
| 35/9-W-4 H | 0,0 | 3 065,0 | - | - | 2021 |
| 35/8-U-5 | 0,0 | 388,9 | - | - | 2017 |
| 35/8-U-4 | 0,0 | 389,3 | - | - | 2017 |
| 35/9-W-2 H | 0,0 | 3 273,0 | - | - | 2021 |
| 35/9-W-3 H | 0,0 | 4 795,0 | - | - | 2024 |
| 35/8-U-6 | 0,0 | 389,4 | - | - | 2017 |
| 35/9-8 | 0,5 | 3 256,0 | 113 °C | 1,33 | 2013 |
Casing and formation tests
No casing programme is reported for this wellbore.