Fields / Kristin / 6406/2-Q-1 H
6406/2-Q-1 H
Development, productionPluggedGas and condensate
Drilled by StatoilHydro ASA with Scarabeo 5 in Kristin, 06.05.2008 to 17.08.2008 (103 days), to 5 852,0 m.
Water depth317,5 m
Total depth5 852,0 m MD
Vertical depth4 899,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigScarabeo 5
Spud06.05.2008
Completed17.08.2008
OperatorStatoilHydro ASA
Position64,8811 N, 6,4350 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Kristin gradient | 35,6 °C/km |
| Estimated at total depth from the gradient | 166 °C |
The gradient is the median of 14 released wells in Kristin with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6406/2-Q-4 H | 0,0 | 5 596,0 | - | - | 2025 |
| 6406/2-5 | 5,7 | 5 439,0 | 190 °C | 2,08 | 1997 |
| 6406/2-5 A | 5,7 | 5 600,0 | 175 °C | 2,04 | 1997 |
| 6406/2-7 | 6,4 | 4 981,0 | 177 °C | 2,06 | 1999 |
| 6406/2-L-3 Y1H | 6,9 | - | - | - | 2025 |
| 6406/2-L-3 Y2H | 6,9 | - | - | - | - |
| 6406/2-L-4 Y1H | 6,9 | - | - | - | 2025 |
| 6406/2-L-4 Y2H | 6,9 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.