Fields / 6407/10-3
6407/10-3
Exploration, wildcatPlugged and abandonedShows
Drilled by Norsk Hydro Produksjon AS with Transocean 8, 29.05.1992 to 27.06.1992 (29 days), to 2 973,0 m in the Basement.
Water depth323,5 m
Total depth2 973,0 m MD
Vertical depth2 972,0 m TVD
Bottom-hole temperature94 °C
Max inclination2,5°
Rotary table23,5 m
Formation at total depthBasement
RigTransocean 8
Spud29.05.1992
Completed27.06.1992
OperatorNorsk Hydro Produksjon AS
Position64,1032 N, 7,3032 E
Formations
19 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 94 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 6407/10-5 | 12,1 | 2 890,0 | - | 1,52 | 2015 |
| 6407/10-4 | 13,9 | 3 224,0 | 115 °C | 1,52 | 2015 |
| 6407/10-2 | 14,0 | 3 825,0 | 120 °C | 1,60 | 1990 |
| 6407/11-1 | 14,7 | 2 175,0 | 87 °C | 1,39 | 2018 |
| 6407/10-1 | 14,9 | 3 347,0 | 120 °C | 1,60 | 1987 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 434,0 | 36" | 436,0 | - |
| Intermediate | 18 5/8" | 802,0 | 26" | 804,0 | 1,59 LOT |
| Intermediate | 13 3/8" | 1 773,0 | 17 1/2" | 1 775,0 | 1,94 LOT |
| Open hole | - | 2 973,0 | 12 1/4" | 2 973,0 | - |
Mud weight
19 measurements, one dot each, 1,00 to 1,45 g/cm³ against measured depth, water based.