Fields / Njord / 6407/7-A-10 BY3H
6407/7-A-10 BY3H
Development, productionClosedOil
Drilled by Norsk Hydro Produksjon AS with Njord A in Njord, 16.04.2003 to 25.04.2003 (9 days), to 5 108,0 m.
Water depth330,0 m
Total depth5 108,0 m MD
Vertical depth2 865,3 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord A
Spud16.04.2003
Completed25.04.2003
OperatorNorsk Hydro Produksjon AS
Position64,2711 N, 7,2026 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Njord gradient | 40,5 °C/km |
| Estimated at total depth from the gradient | 105 °C |
The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/7-A-10 AH same well | 0,0 | 4 407,0 | - | - | 1997 |
| 6407/7-A-10 BY1H same well | 0,0 | 6 115,0 | - | - | 2002 |
| 6407/7-A-10 BY2H same well | 0,0 | 4 833,0 | - | - | 2003 |
| 6407/7-A-10 H same well | 0,0 | 3 764,0 | - | - | 1997 |
| 6407/7-A-11 BH | 0,0 | 4 459,0 | - | - | 2026 |
| 6407/7-A-9 AH | 0,0 | 4 726,0 | - | - | 2005 |
| 6407/7-A-9 BH | 0,0 | 4 852,0 | - | - | 2006 |
| 6407/7-A-9 H | 0,0 | 6 602,0 | - | - | 2000 |
Casing and formation tests
No casing programme is reported for this wellbore.