WellplannerNorwegian shelf well data

Fields / Njord / 6407/7-A-9 BH

6407/7-A-9 BH

Development, injectionProducingGas

Drilled by Norsk Hydro Produksjon AS with Njord A in Njord, 28.01.2006 to 26.02.2006 (29 days), to 4 852,0 m.

Water depth330,0 m
Total depth4 852,0 m MD
Vertical depth2 828,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord A
Spud28.01.2006
Completed26.02.2006
OperatorNorsk Hydro Produksjon AS
Position64,2710 N, 7,2026 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Njord gradient40,5 °C/km
Estimated at total depth from the gradient104 °C

The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6407/7-A-9 AH same well0,04 726,0--2005
6407/7-A-9 H same well0,06 602,0--2000
6407/7-A-10 AH0,04 407,0--1997
6407/7-A-10 BY1H0,06 115,0--2002
6407/7-A-10 BY2H0,04 833,0--2003
6407/7-A-10 BY3H0,05 108,0--2003
6407/7-A-10 H0,03 764,0--1997
6407/7-A-8 AH0,05 278,0--2010

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗