Fields / Njord / 6407/7-A-19 AH
6407/7-A-19 AH
Development, productionProducingOil
Drilled by Statoil Petroleum AS with Njord A in Njord, 10.11.2009 to 29.11.2009 (19 days), to 4 087,0 m.
Water depth330,0 m
Total depth4 087,0 m MD
Vertical depth2 854,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord A
Spud10.11.2009
Completed29.11.2009
OperatorStatoil Petroleum AS
Position64,2713 N, 7,2017 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Njord gradient | 40,5 °C/km |
| Estimated at total depth from the gradient | 105 °C |
The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/7-A-19 H same well | 0,0 | 3 464,0 | - | - | 2009 |
| 6407/7-A-14 H | 0,0 | 4 491,0 | - | - | 1999 |
| 6407/7-A-22 H | 0,0 | 1 135,0 | - | - | 1996 |
| 6407/7-A-15 AH | 0,0 | 4 150,0 | - | - | 1996 |
| 6407/7-A-15 BH | 0,0 | 3 633,0 | - | - | 2005 |
| 6407/7-A-15 H | 0,0 | 4 122,0 | - | - | 1996 |
| 6407/7-A-20 AY1H | 0,0 | - | - | - | - |
| 6407/7-A-20 AY2H | 0,0 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.