Fields / Njord / 6407/7-A-14 H

6407/7-A-14 H

Development, productionClosedOil

Drilled by Norsk Hydro Produksjon AS with Njord A in Njord, 18.12.1999 to 07.02.2000 (51 days), to 4 491,0 m.

Water depth330,0 m
Total depth4 491,0 m MD
Vertical depth3 067,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord A
Spud18.12.1999
Completed07.02.2000
OperatorNorsk Hydro Produksjon AS
Position64,2712 N, 7,2018 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Njord gradient40,5 °C/km
Estimated at total depth from the gradient114 °C

The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6407/7-A-22 H0,01 135,0--1996
6407/7-A-19 AH0,04 087,0--2009
6407/7-A-19 H0,03 464,0--2009
6407/7-A-13 AH0,05 018,0--2005
6407/7-A-13 H0,05 021,0--1999
6407/7-A-15 AH0,04 150,0--1996
6407/7-A-15 BH0,03 633,0--2005
6407/7-A-15 H0,04 122,0--1996

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗