Fields / Njord / 6407/7-A-13 H

6407/7-A-13 H

Development, productionPluggedOil

Drilled by Norsk Hydro Produksjon AS with Njord in Njord, 09.03.1999 to 14.04.1999 (36 days), to 5 021,0 m.

Water depth330,0 m
Total depth5 021,0 m MD
Vertical depth2 941,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord
Spud09.03.1999
Completed14.04.1999
OperatorNorsk Hydro Produksjon AS
Position64,2712 N, 7,2020 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Njord gradient40,5 °C/km
Estimated at total depth from the gradient108 °C

The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6407/7-A-13 AH same well0,05 018,0--2005
6407/7-A-12 H0,05 982,0--1999
6407/7-A-22 H0,01 135,0--1996
6407/7-A-14 H0,04 491,0--1999
6407/7-A-19 AH0,04 087,0--2009
6407/7-A-19 H0,03 464,0--2009
6407/7-A-24 H0,04 731,0--2024
6407/7-A-11 AH0,04 081,0--2009

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗