Fields / Njord / 6407/7-A-12 H
6407/7-A-12 H
Development, productionProducingOil
Drilled by Norsk Hydro Produksjon AS with Njord A in Njord, 25.12.1999 to 31.03.2000 (97 days), to 5 982,0 m.
Water depth330,0 m
Total depth5 982,0 m MD
Vertical depth3 060,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord A
Spud25.12.1999
Completed31.03.2000
OperatorNorsk Hydro Produksjon AS
Position64,2711 N, 7,2022 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Njord gradient | 40,5 °C/km |
| Estimated at total depth from the gradient | 113 °C |
The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/7-A-13 AH | 0,0 | 5 018,0 | - | - | 2005 |
| 6407/7-A-13 H | 0,0 | 5 021,0 | - | - | 1999 |
| 6407/7-A-11 AH | 0,0 | 4 081,0 | - | - | 2009 |
| 6407/7-A-11 H | 0,0 | 5 615,0 | - | - | 1999 |
| 6407/7-A-11 BH | 0,0 | 4 459,0 | - | - | 2026 |
| 6407/7-A-22 H | 0,0 | 1 135,0 | - | - | 1996 |
| 6407/7-A-14 H | 0,0 | 4 491,0 | - | - | 1999 |
| 6407/7-A-10 AH | 0,0 | 4 407,0 | - | - | 1997 |
Casing and formation tests
No casing programme is reported for this wellbore.