Fields / Njord / 6407/7-A-21 H
6407/7-A-21 H
Development, productionDrilling
Being drilled by Equinor Energy AS with Njord A in Njord. Spudded 31.10.2026 and still drilling: day 19.
Water depth330,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord A
Spud31.10.2026
Completed-
OperatorEquinor Energy AS
Position64,2711 N, 7,2027 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Njord gradient | 40,5 °C/km |
The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/7-A-10 AH | 0,0 | 4 407,0 | - | - | 1997 |
| 6407/7-A-10 BY1H | 0,0 | 6 115,0 | - | - | 2002 |
| 6407/7-A-10 BY2H | 0,0 | 4 833,0 | - | - | 2003 |
| 6407/7-A-10 BY3H | 0,0 | 5 108,0 | - | - | 2003 |
| 6407/7-A-10 H | 0,0 | 3 764,0 | - | - | 1997 |
| 6407/7-A-11 BH | 0,0 | 4 459,0 | - | - | 2026 |
| 6407/7-A-11 AH | 0,0 | 4 081,0 | - | - | 2009 |
| 6407/7-A-11 H | 0,0 | 5 615,0 | - | - | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.