Fields / Njord / 6407/7-A-4 AH
6407/7-A-4 AH
Development, productionClosedOil
Drilled by Statoil Petroleum AS with Njord A in Njord, 18.01.2011 to 11.03.2011 (52 days), to 4 320,0 m.
Water depth330,0 m
Total depth4 320,0 m MD
Vertical depth3 260,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord A
Spud18.01.2011
Completed11.03.2011
OperatorStatoil Petroleum AS
Position64,2707 N, 7,2016 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Njord gradient | 40,5 °C/km |
| Estimated at total depth from the gradient | 121 °C |
The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6407/7-A-4 H same well | 0,0 | 5 839,0 | - | - | 2003 |
| 6407/7-A-5 AH | 0,0 | 3 507,0 | - | - | 2000 |
| 6407/7-A-5 BH | 0,0 | 4 247,0 | - | - | 2006 |
| 6407/7-A-5 CH | 0,0 | 4 872,0 | - | - | 2010 |
| 6407/7-A-5 H | 0,0 | 4 951,0 | - | - | 1999 |
| 6407/7-A-3 H | 0,0 | 6 550,0 | - | - | 2011 |
| 6407/7-A-23 H | 0,0 | 3 671,0 | - | - | 2024 |
| 6407/7-A-2 H | 0,0 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.