WellplannerNorwegian shelf well data

Fields / Njord / 6407/7-A-4 H

6407/7-A-4 H

Development, injectionPluggedGas

Drilled by Norsk Hydro Produksjon AS with Njord A in Njord, 03.10.2003 to 11.01.2004 (100 days), to 5 839,0 m.

Water depth330,0 m
Total depth5 839,0 m MD
Vertical depth2 994,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table30,0 m
Formation at total depth-
RigNjord A
Spud03.10.2003
Completed11.01.2004
OperatorNorsk Hydro Produksjon AS
Position64,2707 N, 7,2016 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Njord gradient40,5 °C/km
Estimated at total depth from the gradient111 °C

The gradient is the median of 8 released wells in Njord with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6407/7-A-4 AH same well0,04 320,0--2011
6407/7-A-5 AH0,03 507,0--2000
6407/7-A-5 BH0,04 247,0--2006
6407/7-A-5 CH0,04 872,0--2010
6407/7-A-5 H0,04 951,0--1999
6407/7-A-3 H0,06 550,0--2011
6407/7-A-23 H0,03 671,0--2024
6407/7-A-2 H0,0----

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗