Fields / Marulk / 6507/2-N-2 AH
6507/2-N-2 AH
Development, productionClosedGas and condensate
Drilled by Eni Norge AS with Scarabeo 5 in Marulk, 23.11.2011 to 15.02.2012 (84 days), to 3 364,0 m.
Water depth367,0 m
Total depth3 364,0 m MD
Vertical depth2 804,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigScarabeo 5
Spud23.11.2011
Completed15.02.2012
OperatorEni Norge AS
Position65,9335 N, 7,5435 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Marulk report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/2-N-2 H same well | 0,0 | 2 930,0 | - | - | 2011 |
| 6507/2-N-3 AH | 0,0 | - | - | - | - |
| 6507/2-N-3 H | 0,0 | - | - | - | - |
| 6507/2-N-1 H | 0,0 | 4 918,0 | - | - | 2019 |
| 6507/2-N-4 H | 0,0 | 3 606,0 | - | - | 2011 |
| 6507/2-U-1 | 0,0 | - | - | - | 2009 |
| 6507/2-2 | 2,2 | 3 958,0 | 141 °C | 1,86 | 1991 |
| 6507/2-4 | 2,4 | 3 600,0 | 126 °C | 1,73 | 2007 |
Casing and formation tests
No casing programme is reported for this wellbore.