WellplannerNorwegian shelf well data

Fields / Marulk / 6507/2-N-2 H

6507/2-N-2 H

Development, observationPluggedGas and condensate

Drilled by Eni Norge AS with Scarabeo 5 in Marulk, 02.10.2011 to 16.11.2011 (45 days), to 2 930,0 m.

Water depth367,0 m
Total depth2 930,0 m MD
Vertical depth2 864,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigScarabeo 5
Spud02.10.2011
Completed16.11.2011
OperatorEni Norge AS
Position65,9335 N, 7,5435 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

2 released wells in Marulk report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/2-N-2 AH same well0,03 364,0--2011
6507/2-N-3 AH0,0----
6507/2-N-3 H0,0----
6507/2-N-1 H0,04 918,0--2019
6507/2-N-4 H0,03 606,0--2011
6507/2-U-10,0---2009
6507/2-22,23 958,0141 °C1,861991
6507/2-42,43 600,0126 °C1,732007

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗