6507/2-O-2 H
Development, productionProducing
Drilled by Aker BP ASA with Scarabeo 8 in Ørn, 11.12.2025 to 27.01.2026 (47 days), to 5 263,0 m.
Water depth391,1 m
Total depth5 263,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table33,6 m
Formation at total depth-
RigScarabeo 8
Spud11.12.2025
Completed27.01.2026
OperatorAker BP ASA
Position65,8623 N, 7,3993 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
No released well in Ørn reports a bottom-hole temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/2-O-1 H | 0,0 | 5 568,0 | - | - | 2025 |
| 6507/2-U-3 | 0,0 | - | - | - | 2023 |
| 6507/2-U-5 | 0,1 | 1 415,0 | - | - | 2024 |
| 6507/2-5 S | 2,1 | 4 230,0 | - | 1,83 | 2019 |
| 6507/2-U-6 | 3,8 | 792,0 | - | - | 2025 |
| 6507/2-8 | 3,9 | 4 288,0 | - | - | 2025 |
| 6507/2-1 | 4,6 | 4 477,0 | 156 °C | 1,77 | 1986 |
| 6507/2-2 | 8,1 | 3 958,0 | 141 °C | 1,86 | 1991 |
Casing and formation tests
No casing programme is reported for this wellbore.