WellplannerNorwegian shelf well data

Fields / Ørn / 6507/2-U-3

6507/2-U-3

Other, shallow gasPlugged

Drilled by Aker BP ASA with Scarabeo 8 in Ørn, 06.06.2023 to 07.06.2023 (1 days).

Water depth391,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table33,7 m
Formation at total depth-
RigScarabeo 8
Spud06.06.2023
Completed07.06.2023
OperatorAker BP ASA
Position65,8621 N, 7,3996 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

No released well in Ørn reports a bottom-hole temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/2-O-2 H0,05 263,0--2025
6507/2-O-1 H0,05 568,0--2025
6507/2-U-50,11 415,0--2024
6507/2-5 S2,14 230,0-1,832019
6507/2-U-63,8792,0--2025
6507/2-83,94 288,0--2025
6507/2-14,64 477,0156 °C1,771986
6507/2-28,13 958,0141 °C1,861991

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗