Fields / Ærfugl Nord / 6507/3-9 S
6507/3-9 S
Exploration, wildcatPlugged and abandonedGas
Drilled by BP Norge AS with Polar Pioneer in Ærfugl Nord, 01.06.2012 to 15.07.2012 (44 days), to 2 964,0 m in the Lange Formation.
Water depth365,0 m
Total depth2 964,0 m MD
Vertical depth2 946,0 m TVD
Bottom-hole temperature-
Max inclination13,2°
Rotary table23,0 m
Formation at total depthLange Formation
RigPolar Pioneer
Spud01.06.2012
Completed15.07.2012
OperatorBP Norge AS
Position65,9457 N, 7,6925 E
Formations
13 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
No released well in Ærfugl Nord reports a bottom-hole temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/3-G-1 AH | 3,4 | 3 827,0 | - | - | 2021 |
| 6507/3-G-1 H | 3,4 | 3 467,0 | - | - | 2021 |
| 6507/3-14 | 4,2 | 3 418,0 | - | 1,62 | 2021 |
| 6507/2-4 | 4,5 | 3 600,0 | 126 °C | 1,73 | 2007 |
| 6507/3-13 | 5,5 | 3 420,0 | - | 1,68 | 2019 |
| 6507/3-13 A | 5,5 | 1 343,0 | - | - | 2019 |
| 6507/3-U-1 | 5,5 | - | - | - | 2006 |
| 6507/3-L-2 H | 5,9 | 4 290,0 | - | - | 2009 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 472,0 | 42" | 477,0 | - |
| Surface casing | 18 3/4" | 1 209,0 | 24" | 1 216,0 | 1,68 LOT |
| Pilot hole | - | 1 223,0 | 9 7/8" | 1 223,0 | - |
| Intermediate | 9 5/8" | 2 056,0 | 12 1/4" | 2 063,0 | 1,87 LOT |
| Open hole | - | 2 964,0 | 8 1/2" | 2 964,0 | - |
Mud weight
8 measurements, one dot each, 1,00 to 1,55 g/cm³ against measured depth, oil, synthetic, water.