Fields / 6507/3-14
6507/3-14
Exploration, appraisalPlugged and abandonedDry
Drilled by Equinor Energy AS with West Hercules, 28.07.2021 to 18.09.2021 (52 days), to 3 418,0 m in the Lyr Formation.
Water depth368,0 m
Total depth3 418,0 m MD
Vertical depth3 415,0 m TVD
Bottom-hole temperature-
Max inclination10,2°
Rotary table31,0 m
Formation at total depthLyr Formation
RigWest Hercules
Spud28.07.2021
Completed18.09.2021
OperatorEquinor Energy AS
Position65,9820 N, 7,7187 E
Formations
17 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/3-13 | 1,5 | 3 420,0 | - | 1,68 | 2019 |
| 6507/3-13 A | 1,5 | 1 343,0 | - | - | 2019 |
| 6507/3-U-1 | 4,0 | - | - | - | 2006 |
| 6507/3-9 S | 4,2 | 2 964,0 | - | 1,55 | 2012 |
| 6607/12-P-3 H | 4,3 | 6 751,0 | - | - | 2025 |
| 6607/12-P-2 H | 4,3 | 6 845,0 | - | - | 2025 |
| 6607/12-U-3 | 4,3 | 1 275,0 | - | - | 2023 |
| 6507/3-L-2 H | 4,4 | 4 290,0 | - | - | 2009 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 36" | 448,7 | 42" | 448,7 | - |
| Intermediate | 13 3/8" | 1 343,8 | 17 1/2" | 1 350,0 | 1,58 FIT |
| Intermediate | 9 5/8" | 1 836,0 | 12 1/4" | 1 922,0 | 1,73 FIT |
| Liner | 7" | 2 798,0 | 8 1/2" | 2 798,0 | 1,83 FIT |
| Liner | 7" | 2 897,0 | 8 1/2" | 2 898,0 | 1,82 FIT |
| Open hole | - | 3 267,0 | 6" | 3 267,0 | - |
| Open hole | - | 3 418,0 | 6" | 3 418,0 | - |
Mud weight
19 measurements, one dot each, 1,30 to 1,62 g/cm³ against measured depth, exploradrill, versatec.