Fields / Alve Nord / 6607/12-P-2 H
6607/12-P-2 H
Development, productionClosedOil and gas and condensate
Drilled by Aker BP ASA with Scarabeo 8 in Alve Nord, 27.07.2025 to 10.06.2026 (318 days), to 6 845,0 m.
Water depth369,7 m
Total depth6 845,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table33,6 m
Formation at total depth-
RigScarabeo 8
Spud27.07.2025
Completed10.06.2026
OperatorAker BP ASA
Position66,0015 N, 7,8014 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Alve Nord report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6607/12-U-3 | 0,0 | 1 275,0 | - | - | 2023 |
| 6607/12-P-3 H | 0,0 | 6 751,0 | - | - | 2025 |
| 6507/3-4 | 2,5 | 4 092,0 | 145 °C | 1,54 | 2004 |
| 6507/3-13 | 2,8 | 3 420,0 | - | 1,68 | 2019 |
| 6507/3-13 A | 2,8 | 1 343,0 | - | - | 2019 |
| 6507/3-1 | 3,1 | 4 757,0 | 171 °C | 1,90 | 1990 |
| 6607/12-2 S | 3,6 | 4 404,0 | 158 °C | 1,60 | 2011 |
| 6507/3-U-1 | 3,7 | - | - | - | 2006 |
Casing and formation tests
No casing programme is reported for this wellbore.