6507/3-H-1 H
Development, productionClosedGas and condensate
Drilled by Aker BP ASA with Deepsea Nordkapp in Skarv, 23.01.2021 to 12.03.2021 (48 days), to 3 853,0 m.
Water depth357,0 m
Total depth3 853,0 m MD
Vertical depth2 827,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,7 m
Formation at total depth-
RigDeepsea Nordkapp
Spud23.01.2021
Completed12.03.2021
OperatorAker BP ASA
Position65,8414 N, 7,6927 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Skarv gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 95 °C |
The gradient is the median of 10 released wells in Skarv with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/3-I-1 H | 2,3 | 3 628,0 | - | - | 2025 |
| 6507/3-I-2 H | 2,3 | 4 028,0 | - | - | 2025 |
| 6507/3-I-3 H | 2,3 | - | - | - | 2025 |
| 6507/3-7 | 2,3 | 3 855,0 | 145 °C | 1,56 | 2009 |
| 6507/3-U-2 | 2,3 | - | - | - | 2009 |
| 6507/2-3 | 3,1 | 3 972,0 | 140 °C | 1,80 | 1994 |
| 6507/3-3 | 4,7 | 3 830,0 | 135 °C | 1,50 | 1998 |
| 6507/3-3 A | 4,7 | 4 528,0 | 115 °C | 1,58 | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.