6507/3-U-3
Other, shallow gasPlugged and abandoned
Drilled by BP Norge AS with Borgland Dolphin in Skarv, 04.07.2010 to 06.07.2010 (2 days), to 1 097,0 m.
Water depth392,0 m
Total depth1 097,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table31,0 m
Formation at total depth-
RigBorgland Dolphin
Spud04.07.2010
Completed06.07.2010
OperatorBP Norge AS
Position65,7984 N, 7,7210 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Skarv gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 29 °C |
The gradient is the median of 10 released wells in Skarv with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/3-D-2 H | 0,0 | 3 774,0 | - | - | 2010 |
| 6507/3-D-3 H | 0,0 | 3 903,0 | - | - | 2010 |
| 6507/3-D-4 H | 0,0 | 5 549,0 | - | - | 2020 |
| 6507/3-3 | 0,3 | 3 830,0 | 135 °C | 1,50 | 1998 |
| 6507/3-3 A | 0,3 | 4 528,0 | 115 °C | 1,58 | 1999 |
| 6507/3-3 B | 0,3 | 4 275,0 | 139 °C | 1,58 | 1999 |
| 6507/3-U-2 | 2,8 | - | - | - | 2009 |
| 6507/3-7 | 2,8 | 3 855,0 | 145 °C | 1,56 | 2009 |
Casing and formation tests
No casing programme is reported for this wellbore.