6507/4-5 S
Exploration, appraisalPluggedGas
Drilled by Wintershall Dea Norge AS with Transocean Norge, 26.08.2024 to 29.11.2024 (95 days), to 4 184,0 m.
Water depth454,0 m
Total depth4 184,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table32,9 m
Formation at total depth-
RigTransocean Norge
Spud26.08.2024
Completed29.11.2024
OperatorWintershall Dea Norge AS
Position65,5689 N, 7,2067 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/4-4 A | 0,7 | 2 955,0 | - | 1,47 | 2024 |
| 6507/4-4 S | 0,7 | 3 100,0 | 101 °C | 1,56 | 2023 |
| 6507/4-U-3 | 0,7 | 812,0 | - | - | 2023 |
| 6507/4-U-1 | 3,3 | 1 510,0 | - | - | 2021 |
| 6507/4-2 S | 3,3 | 4 485,0 | 162 °C | 1,67 | 2021 |
| 6507/4-X-2 H | 5,7 | 5 603,0 | - | - | 2025 |
| 6507/4-X-1 AH | 5,7 | 5 540,0 | - | - | 2026 |
| 6507/4-X-1 H | 5,7 | 5 488,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.