Fields / 6507/4-U-3
6507/4-U-3
Other, shallow gasPlugged
Drilled by Wintershall Dea Norge AS with Transocean Norge, 06.07.2023 to 07.07.2023 (1 days), to 812,0 m.
Water depth446,0 m
Total depth812,0 m MD
Vertical depth812,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,9 m
Formation at total depth-
RigTransocean Norge
Spud06.07.2023
Completed07.07.2023
OperatorWintershall Dea Norge AS
Position65,5637 N, 7,2167 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/4-4 A | 0,0 | 2 955,0 | - | 1,47 | 2024 |
| 6507/4-4 S | 0,0 | 3 100,0 | 101 °C | 1,56 | 2023 |
| 6507/4-5 S | 0,7 | 4 184,0 | - | - | 2024 |
| 6507/4-U-1 | 2,9 | 1 510,0 | - | - | 2021 |
| 6507/4-2 S | 2,9 | 4 485,0 | 162 °C | 1,67 | 2021 |
| 6507/4-X-2 H | 5,2 | 5 603,0 | - | - | 2025 |
| 6507/4-X-1 AH | 5,2 | 5 540,0 | - | - | 2026 |
| 6507/4-X-1 H | 5,2 | 5 488,0 | - | - | 2025 |
Casing and formation tests
No casing programme is reported for this wellbore.