Fields / Skarv / 6507/5-1
6507/5-1
Exploration, wildcatPlugged and abandonedOil and gas and condensate
Drilled by Amoco Norway Oil Company with Mærsk Jutlander in Skarv, 24.12.1997 to 03.05.1998 (130 days), to 4 224,0 m in the Åre Formation.
Water depth323,2 m
Total depth4 224,0 m MD
Vertical depth4 222,0 m TVD
Bottom-hole temperature147 °C
Max inclination-
Rotary table23,3 m
Formation at total depthÅre Formation
RigMærsk Jutlander
Spud24.12.1997
Completed03.05.1998
OperatorAmoco Norway Oil Company
Position65,7434 N, 7,6513 E
Formations
26 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 147 °C |
| Skarv gradient | 37,2 °C/km |
| Estimated at total depth from the gradient | 148 °C |
The gradient is the median of 10 released wells in Skarv with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 6507/5-U-2 | 0,5 | 1 130,0 | - | - | 2010 |
| 6507/5-A-2 H | 0,6 | 5 048,0 | - | - | 2024 |
| 6507/5-A-3 AH | 0,6 | 4 654,0 | - | - | 2022 |
| 6507/5-A-3 H | 0,6 | 3 806,0 | - | - | 2010 |
| 6507/5-6 S | 0,6 | 4 991,0 | - | 1,60 | 2010 |
| 6507/5-A-1 H | 0,6 | 5 017,0 | - | - | 2011 |
| 6507/5-J-2 H | 0,6 | 4 138,0 | - | - | 2010 |
| 6507/5-J-1 H | 0,6 | 5 105,0 | - | - | 2010 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 480,0 | 36" | 496,0 | - |
| Surface casing | 20" | 1 053,0 | 26" | 1 065,0 | 1,67 LOT |
| Intermediate | 9 5/8" | 3 199,0 | 12 1/4" | 3 236,0 | 1,95 LOT |
| Liner | 7" | 3 863,0 | 8 1/2" | 4 224,0 | - |
| Open hole | - | 4 224,0 | 8 1/2" | 4 224,0 | - |
Mud weight
23 measurements, one dot each, 1,00 to 1,60 g/cm³ against measured depth, kill mud, oil based, sea water, spud mud.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 3 | 2 993,0 - 3 001,0 | 14,3 | 42,0 | - | 925 | 222 000 |
| 2.1 | 3 430,0 - 3 442,0 | 15,9 | 36,0 | - | 178 | 741 000 |
| 2.2 | 3 430,0 - 3 514,0 | 12,7 | - | - | 148 | 580 000 |
| 1 | 3 607,0 - 3 653,0 | 15,9 | 37,0 | - | 628 | 109 000 |