Fields / 6507/5-U-5
6507/5-U-5
Other, shallow gasPlugged
Drilled by Aker BP ASA with Scarabeo 8, 27.01.2025 to 28.01.2025 (1 days), to 1 320,0 m.
Water depth383,3 m
Total depth1 320,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table33,6 m
Formation at total depth-
RigScarabeo 8
Spud27.01.2025
Completed28.01.2025
OperatorAker BP ASA
Position65,6640 N, 7,5563 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/5-13 A | 0,0 | 3 640,0 | - | - | 2025 |
| 6507/5-13 S | 0,0 | 4 055,2 | - | - | 2025 |
| 6507/5-4 | 3,6 | 3 812,0 | 124 °C | 1,63 | 2001 |
| 6507/5-4 A | 3,6 | 3 883,0 | 118 °C | 1,62 | 2001 |
| 6507/5-K-1 H | 3,7 | 3 834,0 | - | - | 2020 |
| 6507/5-8 | 4,0 | 3 690,0 | 126 °C | 1,63 | 2018 |
| 6507/5-9 A | 4,2 | 2 230,0 | - | - | 2019 |
| 6507/5-9 S | 4,2 | 2 317,0 | - | - | 2019 |
Casing and formation tests
No casing programme is reported for this wellbore.