WellplannerNorwegian shelf well data

Fields / Heidrun / 6507/7-6

6507/7-6

Exploration, appraisalPlugged and abandonedOil and gas

Drilled by Conoco Norway Inc. with Nortrym in Heidrun, 23.07.1986 to 06.09.1986 (45 days), to 2 525,0 m in the Åre Formation.

Water depth350,0 m
Total depth2 525,0 m MD
Vertical depth2 470,0 m TVD
Bottom-hole temperature84 °C
Max inclination2,7°
Rotary table25,0 m
Formation at total depthÅre Formation
RigNortrym
Spud23.07.1986
Completed06.09.1986
OperatorConoco Norway Inc.
Position65,3583 N, 7,3195 E

Formations

13 tops reported, measured depth in metres.

GroupsNordland Group, top 375,0 mNordland GpHordaland Group, top 1 852,0 mHordaland GpRogaland Group, top 1 935,0 mRogaland GpShetland Group, top 2 016,0 mShetland GpFangst Group, top 2 144,5 mBåt Group, top 2 158,5 mBåt GpFormationsNaust Formation, top 375,0 mNaust FmKai Formation, top 1 495,0 mKai FmBrygge Formation, top 1 852,0 mBrygge FmTare Formation, top 1 935,0 mTang Formation, top 1 967,0 mTang FmTilje Formation, top 2 189,5 mTilje FmÅre Formation, top 2 369,0 mÅre Fm3755001 0001 5002 0002 5002 525

Temperature

Reported at total depth84 °C
Heidrun gradient37,8 °C/km
Estimated at total depth from the gradient83 °C

The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/8-D-1 AH0,93 390,0--2010
6507/8-D-1 BH0,93 533,0--2018
6507/8-D-1 H0,93 330,0--2000
6507/8-D-4 AH0,93 890,0--2001
6507/8-D-4 BH0,93 880,0--2001
6507/8-D-4 CH0,93 701,0--2026
6507/8-D-4 DH0,93 044,0--2026
6507/8-D-4 H0,93 198,0--2001

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"473,036"474,0-
Surface casing20"1 024,026"1 030,01,52 LOT
Intermediate13 3/8"2 080,017 1/2"2 087,01,66 LOT
Intermediate9 5/8"2 510,012 1/4"2 525,0-

Mud weight

10 measurements, one dot each, 1,00 to 1,44 g/cm³ against measured depth, waterbased.

1,01,11,21,31,41,505001 0001 5002 0002 500419,0 m: 1,03 g/cm³, WATERBASED1 030,0 m: 1,14 g/cm³, WATERBASED1 303,0 m: 1,16 g/cm³, WATERBASED1 769,0 m: 1,38 g/cm³, WATERBASED1 836,0 m: 1,39 g/cm³, WATERBASED2 050,0 m: 1,42 g/cm³, WATERBASED2 080,0 m: 1,26 g/cm³, WATERBASED2 087,0 m: 1,44 g/cm³, WATERBASED2 305,0 m: 1,27 g/cm³, WATERBASED2 525,0 m: 1,26 g/cm³, WATERBASED

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
22 348,5 - 2 365,052,422,0-62861 450
12 424,0 - 2 411,535,924,0-78246 100