WellplannerNorwegian shelf well data

Fields / Heidrun / 6507/7-A-27

6507/7-A-27

Development, injectionPluggedWater

Drilled by Statoil ASA (old) with Heidrun in Heidrun, 24.05.2005 to 09.07.2005 (46 days), to 3 498,0 m.

Water depth345,6 m
Total depth3 498,0 m MD
Vertical depth2 746,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,2 m
Formation at total depth-
RigHeidrun
Spud24.05.2005
Completed09.07.2005
OperatorStatoil ASA (old)
Position65,3257 N, 7,3175 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Heidrun gradient37,8 °C/km
Estimated at total depth from the gradient92 °C

The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/7-A-27 A same well0,03 383,0--2022
6507/7-A-350,03 684,0--1992
6507/7-A-35 A0,03 725,0--2001
6507/7-A-35 B0,03 731,0--2001
6507/7-A-35 C0,03 657,0--2005
6507/7-A-35 D0,03 707,0--2005
6507/7-A-35 E0,03 690,0--2005
6507/7-A-35 F0,03 635,0--2021

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗