Fields / Heidrun / 6507/7-A-35 B
6507/7-A-35 B
Development, productionPluggedOil
Drilled by Statoil ASA (old) with Heidrun in Heidrun, 12.07.2001 to 19.07.2001 (7 days), to 3 731,0 m.
Water depth345,6 m
Total depth3 731,0 m MD
Vertical depth2 458,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,0 m
Formation at total depth-
RigHeidrun
Spud12.07.2001
Completed19.07.2001
OperatorStatoil ASA (old)
Position65,3257 N, 7,3175 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 81 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/7-A-35 same well | 0,0 | 3 684,0 | - | - | 1992 |
| 6507/7-A-35 A same well | 0,0 | 3 725,0 | - | - | 2001 |
| 6507/7-A-35 C same well | 0,0 | 3 657,0 | - | - | 2005 |
| 6507/7-A-35 D same well | 0,0 | 3 707,0 | - | - | 2005 |
| 6507/7-A-35 E same well | 0,0 | 3 690,0 | - | - | 2005 |
| 6507/7-A-35 F same well | 0,0 | 3 635,0 | - | - | 2021 |
| 6507/7-A-27 | 0,0 | 3 498,0 | - | - | 2005 |
| 6507/7-A-27 A | 0,0 | 3 383,0 | - | - | 2022 |
Casing and formation tests
No casing programme is reported for this wellbore.