Fields / Heidrun / 6507/7-A-32 B
6507/7-A-32 B
Development, productionProducing
Drilled by Equinor Energy AS with Heidrun in Heidrun, 04.01.2026 to 25.01.2026 (21 days), to 3 626,0 m.
Water depth345,0 m
Total depth3 626,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table74,2 m
Formation at total depth-
RigHeidrun
Spud04.01.2026
Completed25.01.2026
OperatorEquinor Energy AS
Position65,3258 N, 7,3179 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 125 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/7-A-32 same well | 0,0 | 3 424,0 | - | - | 2001 |
| 6507/7-A-32 A same well | 0,0 | 3 752,0 | - | - | 2021 |
| 6507/7-A-40 | 0,0 | 3 127,0 | - | - | 1998 |
| 6507/7-A-40 A | 0,0 | 4 354,0 | - | - | 2004 |
| 6507/7-A-40 B | 0,0 | 3 962,0 | - | - | 2020 |
| 6507/7-A-31 | 0,0 | 3 379,0 | - | - | 2002 |
| 6507/7-A-31 A | 0,0 | 3 541,0 | - | - | 2024 |
| 6507/7-A-24 | 0,0 | 5 240,0 | - | - | 2002 |
Casing and formation tests
No casing programme is reported for this wellbore.