WellplannerNorwegian shelf well data

Fields / Heidrun / 6507/7-A-40 A

6507/7-A-40 A

Development, injectionPluggedWater

Drilled by Statoil ASA (old) with Heidrun in Heidrun, 14.08.2004 to 14.09.2004 (31 days), to 4 354,0 m.

Water depth345,5 m
Total depth4 354,0 m MD
Vertical depth2 863,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,2 m
Formation at total depth-
RigHeidrun
Spud14.08.2004
Completed14.09.2004
OperatorStatoil ASA (old)
Position65,3258 N, 7,3179 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Heidrun gradient37,8 °C/km
Estimated at total depth from the gradient96 °C

The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
6507/7-A-40 same well0,03 127,0--1998
6507/7-A-40 B same well0,03 962,0--2020
6507/7-A-320,03 424,0--2001
6507/7-A-32 A0,03 752,0--2021
6507/7-A-32 B0,03 626,0--2026
6507/7-A-390,04 059,0--2004
6507/7-A-39 AY10,04 443,0--2004
6507/7-A-39 AY20,03 629,0--2004

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗