Fields / Heidrun / 6507/7-A-39 AY1
6507/7-A-39 AY1
Development, productionClosedOil
Drilled by Statoil ASA (old) with Heidrun in Heidrun, 23.02.2004 to 11.04.2004 (48 days), to 4 443,0 m.
Water depth345,6 m
Total depth4 443,0 m MD
Vertical depth2 452,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,2 m
Formation at total depth-
RigHeidrun
Spud23.02.2004
Completed11.04.2004
OperatorStatoil ASA (old)
Position65,3258 N, 7,3179 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 81 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/7-A-39 same well | 0,0 | 4 059,0 | - | - | 2004 |
| 6507/7-A-39 AY2 same well | 0,0 | 3 629,0 | - | - | 2004 |
| 6507/7-A-31 | 0,0 | 3 379,0 | - | - | 2002 |
| 6507/7-A-31 A | 0,0 | 3 541,0 | - | - | 2024 |
| 6507/7-A-40 | 0,0 | 3 127,0 | - | - | 1998 |
| 6507/7-A-40 A | 0,0 | 4 354,0 | - | - | 2004 |
| 6507/7-A-40 B | 0,0 | 3 962,0 | - | - | 2020 |
| 6507/7-A-47 | 0,0 | 3 699,0 | - | - | 2001 |
Casing and formation tests
No casing programme is reported for this wellbore.