Fields / Heidrun / 6507/7-A-5 A
6507/7-A-5 A
Development, productionProducingOil
Drilled by Equinor Energy AS with Heidrun in Heidrun, 26.11.2023 to 20.01.2024 (55 days), to 5 232,0 m.
Water depth345,6 m
Total depth5 232,0 m MD
Vertical depth2 458,5 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,2 m
Formation at total depth-
RigHeidrun
Spud26.11.2023
Completed20.01.2024
OperatorEquinor Energy AS
Position65,3259 N, 7,3176 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 81 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/7-A-5 same well | 0,0 | 5 060,0 | - | - | 2016 |
| 6507/7-A-6 | 0,0 | 4 601,0 | - | - | 2001 |
| 6507/7-A-6 A | 0,0 | 4 072,0 | - | - | 2018 |
| 6507/7-A-13 | 0,0 | 3 522,0 | - | - | 1999 |
| 6507/7-A-13 A | 0,0 | 4 389,0 | - | - | 2019 |
| 6507/7-A-14 | 0,0 | 2 904,0 | - | - | 1993 |
| 6507/7-A-14 A | 0,0 | 3 849,0 | - | - | 2014 |
| 6507/7-A-14 B | 0,0 | 3 807,0 | - | - | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.