Fields / Heidrun / 6507/7-A-51
6507/7-A-51
Development, injectionPluggedWater
Drilled by Den norske stats oljeselskap a.s with Heidrun in Heidrun, 19.10.1993 to 08.04.1996 (902 days), to 4 145,0 m.
Water depth345,6 m
Total depth4 145,0 m MD
Vertical depth2 861,6 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table74,2 m
Formation at total depth-
RigHeidrun
Spud19.10.1993
Completed08.04.1996
OperatorDen norske stats oljeselskap a.s
Position65,3257 N, 7,3176 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 96 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/7-A-51 A same well | 0,0 | 3 536,0 | - | - | 2012 |
| 6507/7-A-43 | 0,0 | 3 100,0 | - | - | 1999 |
| 6507/7-A-43 A | 0,0 | 2 871,0 | - | - | 2012 |
| 6507/7-A-43 B | 0,0 | 3 592,0 | - | - | 2021 |
| 6507/7-A-52 | 0,0 | 3 580,0 | - | - | 1992 |
| 6507/7-A-52 A | 0,0 | 3 917,0 | - | - | 2014 |
| 6507/7-A-52 B | 0,0 | - | - | - | - |
| 6507/7-A-44 | 0,0 | 5 151,0 | - | - | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.