Fields / Heidrun / 6507/7-A-52
6507/7-A-52
Development, productionPluggedOil
Drilled by Conoco Norway Inc. with Transocean 8 in Heidrun, 18.10.1992 to 07.02.1993 (112 days), to 3 580,0 m.
Water depth346,0 m
Total depth3 580,0 m MD
Vertical depth2 679,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigTransocean 8
Spud18.10.1992
Completed07.02.1993
OperatorConoco Norway Inc.
Position65,3257 N, 7,3176 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 91 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/7-A-52 A same well | 0,0 | 3 917,0 | - | - | 2014 |
| 6507/7-A-52 B same well | 0,0 | - | - | - | - |
| 6507/7-A-51 | 0,0 | 4 145,0 | - | - | 1993 |
| 6507/7-A-51 A | 0,0 | 3 536,0 | - | - | 2012 |
| 6507/7-A-44 | 0,0 | 5 151,0 | - | - | 1999 |
| 6507/7-A-44 A | 0,0 | 4 702,0 | - | - | 2007 |
| 6507/7-A-44 B | 0,0 | 3 644,0 | - | - | 2015 |
| 6507/7-A-43 | 0,0 | 3 100,0 | - | - | 1999 |
Casing and formation tests
No casing programme is reported for this wellbore.