Fields / Heidrun / 6507/8-F-3 AH
6507/8-F-3 AH
Development, injectionInjectingWater
Drilled by Statoil Petroleum AS with Songa Encourage in Heidrun, 05.04.2017 to 10.06.2017 (66 days), to 3 370,0 m.
Water depth358,0 m
Total depth3 370,0 m MD
Vertical depth2 395,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table32,0 m
Formation at total depth-
RigSonga Encourage
Spud05.04.2017
Completed10.06.2017
OperatorStatoil Petroleum AS
Position65,3695 N, 7,3571 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 80 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/8-F-3 BH same well | 0,0 | - | - | - | - |
| 6507/8-F-3 H same well | 0,0 | 4 408,0 | - | - | 2003 |
| 6507/8-F-2 AH | 0,0 | 3 152,0 | - | - | 2017 |
| 6507/8-F-2 H | 0,0 | 5 390,0 | - | - | 2002 |
| 6507/8-F-4 AH | 0,0 | 3 539,0 | - | - | 2014 |
| 6507/8-F-4 BH | 0,0 | 3 519,0 | - | - | 2017 |
| 6507/8-F-4 CH | 0,0 | 2 762,0 | - | - | 2023 |
| 6507/8-F-4 H | 0,0 | 2 909,0 | - | - | 2002 |
Casing and formation tests
No casing programme is reported for this wellbore.