Fields / Heidrun / 6507/8-F-4 AH
6507/8-F-4 AH
Development, injectionPluggedWater
Drilled by Statoil Petroleum AS with Transocean Spitsbergen in Heidrun, 31.03.2014 to 23.04.2014 (23 days), to 3 539,0 m.
Water depth358,0 m
Total depth3 539,0 m MD
Vertical depth2 398,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table40,0 m
Formation at total depth-
RigTransocean Spitsbergen
Spud31.03.2014
Completed23.04.2014
OperatorStatoil Petroleum AS
Position65,3694 N, 7,3571 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Heidrun gradient | 37,8 °C/km |
| Estimated at total depth from the gradient | 80 °C |
The gradient is the median of 11 released wells in Heidrun with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 6507/8-F-4 BH same well | 0,0 | 3 519,0 | - | - | 2017 |
| 6507/8-F-4 CH same well | 0,0 | 2 762,0 | - | - | 2023 |
| 6507/8-F-4 H same well | 0,0 | 2 909,0 | - | - | 2002 |
| 6507/8-F-1 AH | 0,0 | 5 270,0 | - | - | 2014 |
| 6507/8-F-1 H | 0,0 | 5 319,0 | - | - | 2003 |
| 6507/8-F-3 AH | 0,0 | 3 370,0 | - | - | 2017 |
| 6507/8-F-3 BH | 0,0 | - | - | - | - |
| 6507/8-F-3 H | 0,0 | 4 408,0 | - | - | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.