WellplannerNorwegian shelf well data

Fields / Ula / 7/12-9

7/12-9

Exploration, appraisalSuspendedOil

Drilled by BP Norway Limited U.A. with Ross Isle in Ula, 17.03.1990 to 14.05.1990 (58 days), to 3 820,0 m in the Skagerrak Formation.

Water depth70,0 m
Total depth3 820,0 m MD
Vertical depth3 820,0 m TVD
Bottom-hole temperature147 °C
Max inclination-
Rotary table23,5 m
Formation at total depthSkagerrak Formation
RigRoss Isle
Spud17.03.1990
Completed14.05.1990
OperatorBP Norway Limited U.A.
Position57,0726 N, 2,8824 E

Formations

17 tops reported, measured depth in metres.

GroupsNordland Group, top 92,0 mNordland GpRogaland Group, top 2 771,5 mRogaland GpShetland Group, top 2 961,0 mShetland GpCromer Knoll Group, top 3 425,5 mCromer Knoll GpTyne Group, top 3 631,5 mTyne GpFormationsBalder Formation, top 2 771,5 mSele Formation, top 2 804,0 mLista Formation, top 2 888,0 mEkofisk Formation, top 2 961,0 mTor Formation, top 3 071,5 mTor FmHod Formation, top 3 346,5 mRødby Formation, top 3 425,5 mÅsgard Formation, top 3 485,5 mÅsgard FmMandal Formation, top 3 631,5 mFarsund Formation, top 3 651,5 mUla Formation, top 3 701,0 mSkagerrak Formation, top 3 759,5 m921 0002 0003 0003 820

Temperature

Reported at total depth147 °C
Ula gradient39,2 °C/km
Estimated at total depth from the gradient150 °C

The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
7/12-81,53 900,0151 °C6,011988
7/12-42,73 623,0144 °C1,451977
7/12-4 R2,73 623,0--1984
7/12-1 S3,73 311,0120 °C1,531968
7/12-74,03 855,0149 °C1,561988
7/12-7 R4,03 855,0123 °C-1989
7/12-A-64,83 708,0--1986
7/12-A-6 A4,8----

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"166,036"170,0-
Intermediate20"949,026"950,01,77 LOT
Intermediate13 3/8"2 342,017 1/2"2 350,02,13 LOT
Intermediate9 5/8"3 680,012 1/4"3 684,01,89 LOT
Liner7"3 735,08 1/2"3 742,01,98 LOT
Open hole-3 820,06"3 820,0-

Mud weight

52 measurements, one dot each, 0,90 to 1,55 g/cm³ against measured depth, oil based, water based.

0,91,11,31,51,701 0002 0003 000122,0 m: 1,03 g/cm³, WATER BASED130,0 m: 1,03 g/cm³, WATER BASED168,0 m: 1,03 g/cm³, WATER BASED234,0 m: 1,03 g/cm³, WATER BASED404,0 m: 1,06 g/cm³, WATER BASED591,0 m: 1,03 g/cm³, WATER BASED942,0 m: 1,06 g/cm³, WATER BASED942,0 m: 1,03 g/cm³, WATER BASED950,0 m: 1,06 g/cm³, WATER BASED950,0 m: 1,06 g/cm³, WATER BASED956,0 m: 1,03 g/cm³, WATER BASED956,0 m: 1,03 g/cm³, WATER BASED1 147,0 m: 1,45 g/cm³, WATER BASED1 416,0 m: 1,50 g/cm³, OIL BASED1 812,0 m: 1,05 g/cm³, WATER BASED2 202,0 m: 1,55 g/cm³, WATER BASED2 350,0 m: 1,55 g/cm³, WATER BASED2 350,0 m: 1,55 g/cm³, OIL BASED2 350,0 m: 1,55 g/cm³, OIL BASED2 493,0 m: 1,55 g/cm³, OIL BASED2 861,0 m: 1,55 g/cm³, OIL BASED3 008,0 m: 1,55 g/cm³, OIL BASED3 068,0 m: 1,55 g/cm³, OIL BASED3 077,0 m: 1,55 g/cm³, OIL BASED3 106,0 m: 1,53 g/cm³, OIL BASED3 150,0 m: 1,53 g/cm³, OIL BASED3 150,0 m: 1,53 g/cm³, OIL BASED3 288,0 m: 1,55 g/cm³, OIL BASED3 353,0 m: 1,03 g/cm³, WATER BASED3 441,0 m: 1,55 g/cm³, OIL BASED3 620,0 m: 1,41 g/cm³, WATER BASED3 684,0 m: 1,03 g/cm³, WATER BASED3 684,0 m: 0,93 g/cm³, OIL BASED3 689,0 m: 0,93 g/cm³, WATER BASED3 721,0 m: 0,90 g/cm³, WATER BASED3 732,0 m: 0,93 g/cm³, WATER BASED3 732,0 m: 0,93 g/cm³, WATER BASED3 732,0 m: 0,93 g/cm³, WATER BASED3 732,0 m: 0,93 g/cm³, WATER BASED3 732,0 m: 0,93 g/cm³, OIL BASED3 732,0 m: 0,94 g/cm³, OIL BASED3 732,0 m: 1,03 g/cm³, WATER BASED3 732,0 m: 0,93 g/cm³, WATER BASED3 732,0 m: 0,93 g/cm³, OIL BASED3 737,0 m: 0,90 g/cm³, WATER BASED3 742,0 m: 0,90 g/cm³, WATER BASED3 742,0 m: 0,90 g/cm³, OIL BASED3 742,0 m: 1,03 g/cm³, WATER BASED3 742,0 m: 1,40 g/cm³, WATER BASED3 742,0 m: 1,43 g/cm³, WATER BASED3 820,0 m: 1,40 g/cm³, OIL BASED3 820,0 m: 1,40 g/cm³, WATER BASED

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
13 701,0 - 3 719,012,7--14011 950
Show on the mapOpen on FactPages ↗